Manufacturer of custom science 丨 kitchen hardware installed correctly order!
by:GSH
2021-01-15
Manufacturer of custom science 丨 kitchen hardware installed correctly order!
Decorate the family is a complex project, and most professionals work needs to be done, so we only need to decorate a company, but if you are interested in, some things can start to do myself, hutch defends hardware such as, for example, relative to the water and electricity, such as ceramic tile floor installation, or much simpler.
The normally kitchen hardware installed correctly order should be how?
One, the installation of kitchen hardware order 1, the installation of water tank order: placeholder -
Leading to install -
Place the tank -
Install the inlet pipe of faucet -
Install overflow drain - hole
Install drain - filter basket
Installation of pipes - as a whole
Suspension parts to reinforce the tank - installation
Drainage test -
The edge of the seal around the tank.
2, perform the installation sequence: check the nozzle pipe under the ground
On the tube -
Flat is -
Draw mark -
To play the hole -
- with putty
On the rubber mat -
Screw the nut -
Water tank for drawing two side mark - on the back
Punch -
Insert the bolt -
Twist up -
Alignment - hang back tank horizontal
Screw the nut -
Install back the tank elbow - water
Installed eight - door
Insert the floating gate and a horoscope - door
Tighten the nut.
3, the installation of lavatory order: insert the bolts twist -
Hung on the pot - on the pipe rack
Looking for a flat - put the basin on shelves
The water connection: - basin
Straightening -
Water connection.
4, the installation of bathtubs order: installation - water
Putty tightly closed -
Sheung shui to install -
Try find is flat.
Second, kitchen hardware installation note 1, during the installation process, the tool should not be direct contact with the hardware.
Should be good with a clean soft cloth and then tighten.
2, according to the water installation, circuit diagram to determine the pipe, the location of the wire, must avoid conduit, electrical wiring, in order to prevent the water pipe rupture, interrupt power lines.
3, install, implement, cannot fill below cement, prevent implement rupture, coated with glue, and then stick it on the glass glue.
4, the installation shower room, bath crock to note that before decide whether to retain power.
5, all kinds of faucet or blender, install the stainless steel cover as much as possible.
Installed on the surface of ceramic tile, ceramic tile to use glass drill flower hit wear, or use the steel nails, a hammer knock on ceramic tile ceramic tile down gently wear, electric hammer smashing empty again, avoid breaking ceramic tile.
Custom message